Estimation in the AI era
AI makes coding faster, but estimates don't shrink the way you'd expect. Here's how to adjust.
Key takeaways
- AI mostly shrinks the coding slice of work. Review, integration and understanding remain.
- Re-baseline estimates with real data instead of assuming a fixed speedup.
- Variance grows: some tasks get 10x faster, some get slower.
"AI makes us 10x faster, so cut every estimate by 90%." It's a tempting conclusion and a dangerous one. AI changes the shape of work more than its total size.
#Where the time really goes
A typical feature isn't mostly typing. It's understanding requirements, designing, writing code, reviewing, testing, integrating, deploying and fixing what you learn after release. AI dramatically speeds up writing code and helps with tests and docs. It helps less with:
- Clarifying what the business actually wants.
- Decisions about trade-offs and architecture.
- Debugging subtle integration issues.
- Coordinating across teams.
#Variance goes up
AI-assisted tasks have a wider spread:
- Boilerplate, CRUD, migrations, tests: often 3–10x faster.
- Well-specified algorithms: faster, with careful review.
- Novel, ambiguous or legacy-heavy work: sometimes slower, because the AI confidently goes down wrong paths.
That means ranges matter more than ever. Use three-point estimates and throughput forecasts.
#Practical adjustments
- Re-baseline with data. Track throughput for 6–8 weeks after adopting AI tools before changing commitments.
- Estimate review effort explicitly. "Generate: 1 day, review & harden: 2 days."
- Split by AI-friendliness. Tag tasks as routine or novel, and estimate them differently.
- Shorter horizons. With faster bolts, plan in smaller increments and re-forecast often.
- Include learning time. Teams new to AI tools are slower at first.
Warning: Don't let leadership convert "AI tools" into "same team, double the scope" before you have data. That's how you get burnout and incidents.
#Communicating the change
Note: "AI tools are speeding up our routine coding a lot. Overall lead time has improved about 25% so far, mostly on well-defined work. We're tracking it and will update our forecasts monthly."
Honest, measured and specific. It builds trust on both sides.
Keep reading
The cone of uncertainty, the difference between estimates, targets and commitments, and the habits that make estimates useful.
The most common estimation techniques, when to use each, and an interactive PERT calculator.
Use your team's real throughput to forecast delivery dates with probabilities, and try it yourself.